Integrated Project Management
Click on a process group, discipline, knowledge area, process or output to see additional information. View by Discipline:
Hide outputs
All
■ Project management
□ IT management
∆ Change management
Clear all filters x Initiating process group
x Infrastructure management knowledge area
x Prepare high-level technology requirements process
x High-level technology requirements output

INFORMATION TECHNOLOGY (IT) MANAGEMENT The discipline devoted to planning, organizing and coordinating resources to analyze, design, configure and/or develop a system that meets user requirements.
Initiating Defining a new project or a new phase of an existing project by obtaining authorization to start the project.
Infrastructure management Initiating, planning, executing and controlling requirements for the location and configuration of the physical components of a new system.
Prepare high-level technology requirements A process resulting in a/n High-level technology requirements - a general description of technology constraints, and capacity and performance information required to support a proposed system.
High-level technology requirements A general description of technology constraints, and capacity and performance information required to support a proposed system.

Initiating Planning Executing Controlling Closing
Prepare high-level technology requirements
High-level technology requirements
Define existing technology architecture
Existing technology architecture diagram

Prepare infrastructure management plan
Infrastructure management plan
Define detailed technology requirements
Detailed technology requirements
Prepare facility modification plan
Facility modification plan
Prepare system installation plan
System installation plan









Prepare and order equipment
Equipment order confirmation
Complete facility modifications
Site readiness confirmation
Install system
Application readiness confirmation
Hardware readiness confirmation









Control infrastructure
Organizational process asset update
Performance report
Change Request (CR)
Project document update